
Client: Peace Bridge Canada
Location: Fort Erie, Ontario
Delivery Method: Building Improvements
Size:
Completion: 2025
Mechanical repair of roll-up garage door
Surface preparation and rust removal
Application of metal primer and industrial coatings
High-visibility exterior finish
Work completed in an active traffic-controlled environment
RTIC Services was engaged to repair and repaint a roll-up garage door at the Peace Bridge facility. The project included mechanical repairs to restore proper door operation, followed by thorough surface preparation to remove rust and deteriorated coatings. A metal primer and durable industrial paint system were applied to protect the door from corrosion and environmental exposure. The work was completed in an active operational area, requiring careful scheduling and adherence to safety procedures.





